Kramp Holding


Kramp Holding
  • Location Varsseveld
  • GFA 16.000 m2
  • Function Kantoorgebouwen, spreek- en vergaderruimten en magazijnen
  • Completion Completed (2014)
  • Particularities WKO installatie met 6 bronnen

Project description

The building is heated and cooled by the climate ceilings that are incorporated into each format. This allows for a flexible format of the office rooms. A thermal storage installation was used to generate heat and for cooling. This installation consists of six open sources, allowing for passive cooling in the summer and heating using a heat pump during the winter. For heating high temperature areas (existing installation), three additional boilers with a total power of approximately 1200 kW were used to provide the remaining heat.

 