Sport center Helsdingen Vianen


Sport center Helsdingen Vianen
Sport center Helsdingen Vianen
Sport center Helsdingen Vianen
Sport center Helsdingen Vianen
Sport center Helsdingen Vianen
  • Location Vianen
  • GFA 7.500 m2
  • Function Sporthal (4 stuks) zwembaden en horeca.
  • Completion Completed (2014)
  • Particularities Integratie van DALI LED-verlichting en DALI PIR (multisensor voor beweging en lichtintensiteit).

Project description

Total cost of ownership

The complex consists of two sports halls, a dojo, a swimming and training pool, and a catering facility. The development, construction and maintenance of the sports center was tendered and awarded in 2013 based on the total cost of ownership (TCO). Using this a guiding principle, all the costs, both in terms of construction and operations, were taken into account. With this insight and the attentive, life-proof design, the municipality of Vianen managed to maintain control of the costs throughout the entire life cycle.

Special, sustainable constructions

INNAX achieved the installations on a turnkey basis and assumed the risk for the maintenance, administration and energy management of the installations over the course of 20 years. This allowed the municipality to be certain of receiving a steady sum for the energy, administration and maintenance of the installations.

This project was put into place by the Vaessen Algemeen Bouwbedrijf in cooperation with construction specialists INNAX and Slangen+Koenis Architecten. Vaessen Algemeen Bouwbedrijf was inspired by Lean philosophy. The result of this was that the complex was built in just thirteen months, rather than the usual eighteen. Source: Innax.nl

 

Terug naar boven